In November Historic England published their 2026 Heritage at Risk Register, which lists all the Grade II*, Grade I and scheduled historic structures and places that it believes are in danger of being lost. The Register gives an annual snapshot of the health of England’s historic buildings and places. It helps to ensure they can be protected and continue to be enjoyed in the future.
197 sites have been added to the list in 2026. Amonsgt these are the following industrial heritage buildings:
- Bidston Windmill, Wirral
- Cromer Windmill, Hertfordshire
- Kirkaldy’s Testing and Experimenting Works, Southwark, London
- Flockton Wagonway Viaduct, Kirkburton, Yorkshire
- Lelley Windmill, Elstronwick, Yorkshire
85 sites have been removed from the list in 2026. Amonsgt these are the following industrial heritage buildings:
- Cromford Upper Mill, Derbyshire
- Holmslinn Lead Mine, Allendale, Yorkshire
- Museum of the Gorge (Severn Wharf Building), Ironbridge, Shropshire
- Newlynn Old Harbour, Cornwall
- Waltham Windmill, Yorkshire




